|
|
6 Middle Space Renovation
Client: Watkins Johnson
Cost: $14,000,000
Size: 50,000 sq. ft.
Location: Scotts Valley, California
|
|
CRB provided mechanical, electrical, plumbing, and process piping design services for the renovation of existing warehouse and assembly space into Class 10,000 and Class 1,000 cleanroom spaces.
Watkins-Johnson needed a highly efficient, clean assembly area capable of producing 10 tool systems per week in an environment that presented a substantially improved image and cleanliness level. The facility was to be constructed without significantly disrupting the current production of tool systems on the same level.
|
Next Project
Copyright © 2006 Clark, Richardson & Biskup Consulting Engineers. All rights reserved.
Privacy Policy |